{"id":58807,"date":"2016-12-01T08:06:08","date_gmt":"2016-12-01T07:06:08","guid":{"rendered":"http:\/\/beta.next-finance.net\/news\/meridiam-reaches-financial-close-in-turkey-for-elazig-integrated-health-campus-ppp-project-with-the-first-investment-grade-and-social-project-bond-enhanced-by-ebrd-and-miga\/"},"modified":"2016-12-01T08:06:08","modified_gmt":"2016-12-01T07:06:08","slug":"meridiam-reaches-financial-close-in-turkey-for-elazig-integrated-health-campus-ppp-project-with-the-first-investment-grade-and-social-project-bond-enhanced-by-ebrd-and-miga","status":"publish","type":"post","link":"http:\/\/beta.next-finance.net\/en\/news\/meridiam-reaches-financial-close-in-turkey-for-elazig-integrated-health-campus-ppp-project-with-the-first-investment-grade-and-social-project-bond-enhanced-by-ebrd-and-miga\/","title":{"rendered":"Meridiam reaches financial close in Turkey for Elazig integrated health campus PPP project with the first investment grade and social project bond enhanced by EBRD and MIGA"},"content":{"rendered":"<p>This project is a landmark social infrastructure PPP : the first \u2018green and social bond\u2019 for an infrastructure<br \/>\nproject in Turkey; the first long-term project bond in the Turkish PPP market with a 20-year maturity; and the<br \/>\nfirst project to feature the credit enhancement provided by the European Bank of Reconstruction and<br \/>\nDevelopment (EBRD) and the World Bank\u2019s Multilateral Investment Guarantee Agency (MIGA) following the<br \/>\nCOP21 global commitment to support Emerging countries Sustainable Development Goals (SDG).<\/p>\n<p><quote>Meridiam\u2019s third hospital PPP to close in Turkey, the Elazig Project will entail the design, construction,<br \/>\nfinance, operation and maintenance of a 1038-bed integrated healthcare campus.<\/quote><\/p>\n<p>Together with Ronesans, Meridiam, the EBRD and MIGA structured a first time credit enhancement scheme,<br \/>\nwhich enabled Moody\u2019s to assign a Baa2 rating, two notches above the current rating of Turkey. The<br \/>\ncomplementarity of the EBRD and MIGA products enabled a credit enhancement scheme instrumental in<br \/>\nsupporting debt capital markets products as an alternative source of funding for infrastructure. The \u20ac288<br \/>\nmillion bond has been issued by way of a private placement amongst leading financial institutions, notably<br \/>\nincluding IFC who underwrote a portion without enhancement and Proparco (Groupe AFD) demonstrating<br \/>\nthe strong commitment of France in supporting SDGs.<\/p>\n<p>The project bond has been certified as \u201cGreen and Social\u201d by Vigeo EIRIS.<br \/>\n<quote>Following the Meridiam Impact<br \/>\ninvestment standards, the Project will fully meet Meridiam ESG requirements as well as IFC\u2019s Performance<br \/>\nStandards (2012), MIGA&#8217;s Performance Standards (2013), the EBRD\u2019s Performance Requirements (2014)<br \/>\nand the World Bank Group Environmental, Health and Safety (EHS) Guidelines.<\/quote><\/p>\n<p>The Project consists of a 1038-bed integrated health campus comprising a general hospital, women\u2019s and<br \/>\nchildren\u2019s hospital, psychiatric hospital, mouth and dental health Centre, and additional support buildings and<br \/>\nfacilities. The campus will help serve a growing population in eastern Turkey by offering greater access to<br \/>\nhigh quality healthcare services and technology, as well as additional capacity for expansion in the future.<br \/>\nServing not only as a landmark in the transformation of Turkey\u2019s healthcare sector, as Turkey\u2019s first project<br \/>\nbond, Elazig is also expected to catalyze Turkey\u2019s nascent capital markets sector for infrastructure funding.<\/p>\n<p><em>\u201cThe Elazig green and social project bond clearly demonstrates the leadership of EBRD and MIGA as<br \/>\nmultilateral institutions designing solutions to support investment and SDGs of emerging and transition<br \/>\neconomies; and we will continue to pioneer new solutions together with them,\u201d<\/em> said Thierry Deau,<br \/>\nFounder\/Chairman, Meridiam.<\/p>\n<p>MUFG supported the bond financing as bookrunner, and HSBC acted as sole arranger and global<br \/>\ncoordinator for the bond issue. Total project costs amounted to approximately \u20ac360 million, financed through<br \/>\nthe bond issue and equity investment by the shareholders of ELZ Saglik Yatirim A.S., the project company<br \/>\nformed to implement the Project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Meridiam, a leading global investor and asset manager specializing in public and community<br \/>\ninfrastructure, announced today that it has reached financial close for the Elazig Integrated Health<br \/>\nCampus PPP Project.<\/p>\n","protected":false},"author":20,"featured_media":58805,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1470],"tags":[1655,1682,1651,2094,2007,2139,1685],"_links":{"self":[{"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/posts\/58807"}],"collection":[{"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/comments?post=58807"}],"version-history":[{"count":0,"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/posts\/58807\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/media\/58805"}],"wp:attachment":[{"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/media?parent=58807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/categories?post=58807"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/beta.next-finance.net\/en\/wp-json\/wp\/v2\/tags?post=58807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}